
For installers.
Specs, maintenance documentation, installation guide, and direct technical contact.
Specs.

- Weight
- 7 kg/m²
- Panel dimensions
- 650 × 420 mm
- Material
- 45 % glass fiber, 55 % resin
- Fastening method
- Slide-locks with integrated battens
- Fastened with
- Coil nails directly into roof structure
- Min. roof pitch
- 8°
- Fire classification
- F (8 m to nearest building)
- Expected lifespan
- 30+ years
- Production
- Beform AS, Norway
How it's installed.
Bu Panel is installed with standard roofing tools. You fasten the panels with coil nails directly into the roof structure. Slide-locks with integrated battens make installation faster. No separate battens.
Full description is in the installation guide. If you have questions mid-installation, call William directly — he is on the phone during business hours.
Documentation.
Open in a new tab. Ready for the project folder.
Product data sheet
Technical data and specifications.
Open →
Installation guide
Step-by-step installation of Bu Panel.
Open →
Warranty certificate
Transferable 30-year product warranty.
Open →
FDV data sheet
Management, operation and maintenance.
Open →
Need more info? Book a consultation.
Questions you might have.
Yes. A coil nail gun is the main tool. No specialty tools required. It is like nailing battens onto the roof. The panels can be cut with a circular saw or jigsaw.
About 10 min per m² — roughly 30 % faster than steel tiles. Slide-locks with integrated battens save time compared to systems where you must lay them separately.
Yes, for professionals who order regularly. Book a technical consultation for specific terms.
Standard roof structure with finished underlayment (vapor-permeable membrane). You fasten directly into counter-battens or directly into the roof structure depending on the build-up. Details in the installation guide.
Ordering for a customer or have a project underway — book a consultation and we will go through pricing, lead time and delivery terms specifically. We have separate terms for professionals who order regularly.
Lead time: typically 4–6 weeks from order.
Delivery: to project address in Norway.
Warranty: 30-year product warranty.
Call William directly. We ship replacement panels quickly.
For roofers who want to become certified Bu installers — book a technical consultation and we will go through the process. We are building out the certification program throughout 2026.
Ready to take a closer look?
Download the documentation pack or call William.



