We are building a roof for Western Norway.
Here you see what we have done and what is left before the first roofs are laid.

1 · 2023–2024
It started with a roof tile.
1 / 3
Bu Composite AS was founded in Bergen in 2023. At the start we developed a roof tile.
In 2024 we won Best Idea in Western Norway and went on to the national competition 100 Pitches.
2 · 2025–2026
1.5 kilos. Batten built in. Does not rust.
1 / 2
Bu Panel is made of recycled composite: plastic reinforced with glass fibre. Each panel weighs 1.5 kg, about 7 kg per square metre.
The batten is part of the panel, so the carpenter does not have to lay battens (the horizontal boards the roof is fixed to). The panels slide into each other and are fixed with screws or machine nails. The fixings are hidden, and the panel does not rust.
The surface is dense and does not take up water the way concrete tiles do.
The patent application for the fastening system has been approved, and the patent will be granted on 28 November 2026.
The pictures are illustrations of the panel.
3 · 2025–2026
How we chose the material.
We started with recycled glass fibre from wind turbine blades. Together with Western Norway University of Applied Sciences we tested about 50 samples, in tension at −30, 23 and 50 degrees, and in fire.
Today we make the panel from polypropylene from industrial residual material with new glass fibre, UV- and heat-stabilised. We are now fine-tuning the mix for the right balance between appearance, strength, lifetime and cost, and have gone from 30 to 40 % glass fibre.
The official fire test, BROOF(t2), is done at RISE on the panels from the pilot series. We will post the result here.
4
There are five of us.
We are a small company in Laksevåg. We have developed a new roof panel, and while production gets going, we do roof inspections in Bergen.

Elias Haugen
CEO
William Tvedt
Sales and technical lead

Henrik Nedrebø
Account Manager

Jakub Wijata
Head of Marketing
Tomasz Wijata
Head of Technology
5
Those who support us and make the panel.

The panel is to be series-produced in Norway at Beform, with whom we have had a production agreement since 2025.
These have supported us on the way:
6
27 roofs inspected so far.
1 / 3
While production gets going, we do roof inspections in Bergen. The roof is checked with a drone.
It is free, and the report comes within 48 hours of the visit.
Is there a roof you are wondering about?
Book a free roof inspection7
Where we are now.
- Idea2021–2023
- Test roofs2025, Sandane and Poland
- Bu PanelnowTesting and final adjustments
- PilotDecember 2026
- First deliveriesFebruary 2027
Step 3 · Panel
The patent application is approved
The patent application for the fastening system of Bu Panel has been approved, and the patent will be granted on 28 November 2026.
See the step
Step 2 · Panel
Two test roofs and a production agreement
We laid the first version of our roof tile on two test roofs, at Sandane and in Poland. We filed a patent application and signed a production agreement with Beform.
See the step1 / 2
Step 1 · Team
Best Idea in Western Norway
We won Best Idea in Western Norway and went on to the national competition 100 Pitches.
See the step1 / 2
1 / 2
8
What is left.
- December 2026: the first customer roofs with Bu Panel go on.
- February 2027: deliveries start.
Reserve a place
- Places go in the order they are reserved.
- You hear from us before anyone else when production starts.
We have emailed you your place. We will be in touch before production starts.
9
We post every step.
Just want to follow along? Leave your email, and we will tell you when we launch.
Hear from us when we launch
Thank you. We will email you when we launch.





















